Project Portfolio

Holistic Orchard Care

Integrated pest management for orchards across the state

Mulberry Blooms

Red plum after 2 year treatment plan for plum curculio

Red plum in bloom

Yellow transparent apples just before harvest

Barbara White Studio

Vermont Studio Center - Johnson Vermont

86ftx8ft raised garden bed.

June 2024

Weeded and removed topsoil down three feet.

Releveled foundation and chipped slate

Built new bed out of 78 6x6 Hemlock beams.

Added 15 yards of organic compost to match new height of bed.

Replanted with Chamomile, Echinacea, Valerian, Bee Balm, Lavender, Nicotiana, Yarrow and Rose.

Setup automated watering with soaker hoses.

Project time: 24 days

Johnson VT, Vermont Studio Center

August-October 2024

With any project that takes place in a flood plain, water absorption and erosion are the primary concerns over the course of a larger scale project of phytoremediation. Plant and fungal diversity are vital to soil health, as well as water and nutrients retention.

After a ADA accessible pathway was installed, we scrapped and removed the top layer of sand and clay fill used. then regrading the land to provide an even dispersal of water coming off the building. Then we dug a berm 8 inches down, filled it with river rock, then added 40 yards of compost to the 14,000 sqft space. On the north side of the berm we plants a rainfall garden for higher absorption of water, on the south side a native pollinator meadow.

Project time: 2 months

As of spring 2026, the meadow is self seeding and is a thriving ecosystem for native pollinators

Native Pollantor Meadow

Garden Beds Turnovers